58.7 F
Redwood City
Sunday, November 17, 2024
spot_img

Road maintenance to begin in San Mateo County

roads in San Mateo County

San Mateo County will begin repairing cracked and rough pavement along a series of roads between Highways 1 and 35 - Skyline Boulevard - beginning Monday, August 29.

Ultimately, the project will improve road surfaces in San Mateo County, but will cause short-term delays and inconvenience to bicyclists. This is the 15th year of the county's "chip seal" road maintenance program, a proven, cost-effective method that improves surfaces and causes less disruption to the traveling public than other treatments.

The project involves 50 miles of county-maintained roads. Beginning Monday, Aug. 29, work will begin on Sunshine Valley Road, then move to Higgins Canyon Road and Purisima Creek Road.

While work in specific areas may vary, the project generally involves placing a layer of oil-in-emulsion over the existing roadway and applying a layer of crushed rock over the emulsion, a process known as "chip sealing" because of the small rocks, or chips, placed on the surface.

After that, sweep the roads immediately after placing the chip seal, to repeat one week later and again at 90 days.

"It is important that we continue to invest in these roads, as we have been doing for several years, to maintain the condition of these roads and minimize deterioration over time," said Ann Stillman, director of the Department of Public Works.

"Chip seals have less impact to the public, as vehicles can drive over them immediately after the rocks are placed and rolled. There is no cure time or extended road closures," Stillman noted. "Another reason to use a chip seal is that it allows some of the work to be completed by in-house personnel, which creates additional savings for the county."

Pros and Cons

San Mateo County detailed in a release that it understands that chip seals have advantages and disadvantages. Cyclists have expressed concern during a community input process that loose chips that may remain in the roadway can pose a safety hazard.

Public Works crews will monitor the work to determine if additional street sweeping would be beneficial.

In addition, Public Works will install signs along San Mateo County roads scheduled for maintenance. The signs will alert motorists and bicyclists about the project to use extra caution when using the roadways.

The signs will also include the Department of Public Works Highway Division number to request sweeping or report problems once the project begins: 650-363-4103.

All roads scheduled for work have previously received gravel seals.

On the "pro" side, Public Works is committed to prolonging the life of the pavement and maintaining the 316 miles of the county's road network in the most cost-effective manner. The current approach for many coastal roads allows each road to receive a "sealed" surface treatment approximately every 5 to 7 years.  

Gravel seals are a widely used cost-effective treatment for rural and lightly trafficked roads, and the past 15 years of gravel seal projects have greatly improved the condition and reliability of the county's coastal road network.

Next steps

The San Mateo County road maintenance project is scheduled to begin on Monday, August 29, 2022 and will take approximately four weeks to complete the 50 miles of roads.

Project updates with a timeline of affected roads will be posted on the site. Project website.

You may be interested in: North Fair Oaks seeks resident input for mural project

Peninsula 360 Press
Peninsula 360 Presshttps://peninsula360press.com
Study of cross-cultural digital communication

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Stay connected

951FansLike
2,114FollowersFollow
607FollowersFollow
241SubscribersSubscribe

Latest articles

es_MX